Link-systems LinkNet II Manuale Utente Pagina 60

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 99
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 59
4.15.1 Adding a Preventive Maintenance Item
To add a PM item, hit the “Add PM Item” button and the dialog from the PM listing dialog of a
machine or tool (see Figure 4.39 and Figure 4.40) and a dialog box similar to Figure 4.41 should be
displayed. Note that this dialog box is identical for machines and tools.
Figure 4.41: Preventive Maintenance Configuration Dialog Box
The settings on this dialog box are as follows:
PM Item Name: Enter the description for this PM item. This could be “Bearing Check”, “Clutch/Brake
Wear Check”, “Press Stopping Time Check”, etc. This description will appear in the PM listing and in
PM reports.
Manual Version 1.1 10/28/2001
4.38
Vedere la pagina 59
1 2 ... 55 56 57 58 59 60 61 62 63 64 65 ... 98 99

Commenti su questo manuale

Nessun commento